undefined brand logo
undefined banner 3

Design, Supply, and Implementation of a Modular Data Center

Design, Supply, and Implementation of a Modular Data Center

Client

Maysan oil company

Duration

1 year

Category

Infrastructure Development

Date

2026

Project Summary :

Design, supply, and implementation of a fully integrated Modular Data Center for Maysan Oil Company, in accordance with Tier III reliability requirements issued by the Uptime Institute. The project aims to provide advanced, highly available IT infrastructure capable of hosting and operating the company's systems, applications, and digital services, while ensuring business continuity and protecting data and IT resources.

Project Scope :

1) Engineering Studies and Design (Engineering & Design) 1.1. Study and analyze Maysan Oil Company's technical and operational requirements. 1.2. Determine the data center's capacity and the required number of equipment racks. 1.3. Identify electrical loads and cooling and connectivity requirements. 1.4. Prepare engineering, architectural, electrical, mechanical, and network designs and drawings. 1.5. Design the infrastructure in accordance with Tier III requirements, adopting the Concurrently Maintainable principle. 1.6. Prepare technical specifications, Bills of Quantities (BOQs), and detailed execution drawings. 2) Modular Infrastructure 2.1. Supply and implement the modular data center unit. 2.2. Supply and install server racks and network equipment. 2.3. Implement insulation systems and protection against environmental factors. 2.4. Prepare cable pathways and cable management and organization systems. 2.5. Provide access control and physical security monitoring systems. 3) Electrical and Power Infrastructure 3.1. Supply and implement the electrical power distribution system. 3.2. Provide UPS systems designed to support redundancy and concurrent maintenance. 3.3. Supply Rack Power Distribution Units (Rack PDUs). 3.4. Provide distribution panels and independent, redundant power supply paths. 3.5. Supply and connect generators and backup power sources in accordance with the approved design. 3.6. Implement grounding systems and protection against voltage surges and electrical disturbances. 3.7. Adopt appropriate redundancy for critical electrical components in accordance with Tier III requirements. 4) Cooling and Environmental Control 4.1. Supply and install Precision Cooling systems. 4.2. Design the cooling system based on the N+1 redundancy principle, wherever required by the design. 4.3. Provide backup cooling units and appropriate distribution pathways. 4.4. Implement airflow management systems within the data center. 4.5. Provide temperature and humidity monitoring systems, along with early warning alerts. 4.6. Ensure that cooling system components can be maintained without affecting critical loads. 5) Fire Protection and Physical Security 5.1. Supply and install early smoke and fire detection systems. 5.2. Provide fire suppression systems using gas suitable for data center environments. 5.3. Implement alarm, alert, and emergency monitoring systems. 5.4. Supply access control and identity verification systems. 5.5. Provide CCTV surveillance systems in accordance with site requirements. 5.6. Implement the required safety and physical security measures for the data center. 6) Network and Connectivity Infrastructure 6.1. Supply and install internal network components. 6.2. Provide Network Switches and connectivity equipment. 6.3. Implement structured fiber-optic and copper cabling. 6.4. Prepare connectivity pathways to the company's external sites and systems. 6.5. Provide redundant communication paths for critical components and services, in accordance with the design. 6.6. Implement Network Segmentation and secure access controls. 7) Monitoring and Data Center Infrastructure Management (DCIM) 7.1. Provide a Data Center Infrastructure Management (DCIM) system. 7.2. Monitor power, cooling, temperature, humidity, and equipment status. 7.3. Monitor the performance of servers, storage systems, and network components. 7.4. Provide an alerting system and operational event management. 7.5. Develop monitoring dashboards and performance and availability reports. 7.6. Enable IT teams to centrally manage and monitor the data center. 8) Testing, Commissioning, and Handover 8.1. Conduct Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for components and systems. 8.2. Test power, cooling, connectivity, and protection systems. 8.3. Test failure scenarios, including power source failures and failures of critical components. 8.4. Verify that components can be maintained without affecting the operation of critical loads. 8.5. Conduct integration, performance, and reliability tests. 8.6. Commission the data center and verify its operational readiness. 8.7. Train Maysan Oil Company's technical and operational personnel. 8.8. Handover final drawings, technical documentation, and operation and maintenance manuals.