
Design and Implementation of Low Current Systems – Karkh Second Investigation Court



Client
Supreme Judicial Council
Duration
2 Month
Category
Low-current
Date
2025
Project Summary :
Upgrading and integrating the low current systems into a unified platform across the court complex through an integrated approach that protects the facility and ensures the uninterrupted operation of judicial activities around the clock.
Project Scope :
1. Assessment and Planning 1.1 Existing Systems Assessment: Evaluating the existing low current systems across the complex and identifying the requirements for upgrading them. 1.2 Solution Design: Identifying suitable systems and equipment from reputable manufacturers to meet operational and performance requirements. 2. Surveillance and Safety 2.1 CCTV Surveillance: Implementing and upgrading a high-definition CCTV surveillance system to monitor the complex's facilities and record security incidents. 2.2 Fire Alarm System: Implementing and upgrading the fire detection and alarm system to provide early warnings, alert occupants, and initiate emergency response procedures. 3. Testing and Commissioning Testing and Commissioning: Conducting comprehensive tests and commissioning the systems to ensure proper performance and compliance with design specifications.


